NEW QUESTION # 42
What influences whether an items is displayed in a specific dashboard scope? NOTE: There are 3 correct answers to this question
- A. Proposal flag
- B. Decision point status
- C. Item status group
- D. Escalation flag
- E. Priority
Answer: B,C,D
NEW QUESTION # 43
In a existing project management project, all objects have been released and all subordinate tasks for the checklist items have been completed.
Why does the status change fail when you try to set the status of the checklist to Finish?
How can you trigger a workflow for a portfolio item?
- A. At least of the tasks has been configured
- B. A checklist item is still open
- C. The checklist item result is set to not ok
- D. You are missing the authorization for changing the project
Answer: C,D
NEW QUESTION # 44
Which customizing activity do you use to integrate capacity planning of an item with financial planning?
- A. Define portfolio type
- B. Define financial integration scenarios
- C. Define financial planning settings
- D. Define financial and capacity views
Answer: B
NEW QUESTION # 45
When is Bottom-up scheduling mandatory?
- A. When parallel phasing is used
- B. When summary tasks are used
- C. When actual time are recorded
- D. When constraints are used
Answer: B
NEW QUESTION # 46
What can you with roles in project management?
NOTE: There are 3 correct answers to this question
- A. Define authorizations for reporting
- B. Define decision makers for an approval process
- C. Define responsibilities for structure element
- D. Enable resource management
- E. Define responsibilities for structure element
Answer: B,D,E
NEW QUESTION # 47
What data can you synchronize between a portfolio item and an initiative using Decision Flow management?
- A. Metrics
- B. Documents
- C. Notes
- D. Development Cost
Answer: D
NEW QUESTION # 48
You want to use a customer-specific status for items.
How do you configure the status in customizing?
- A. Create the status
Assign the status to a portfolio item type
Specify the status transitions with respect the portfolio item type - B. Create a business add-in (BAdi) for customer-specific status management Activate the BAdi for the portfolio item type
- C. Create the status and status transition within the portfolio type
Assign the portfolio item type to the portfolio type - D. Create a status profile for the portfolio item objet type
Create the status within the status profile
Assign the status profile to a portfolio item type
Answer: A
NEW QUESTION # 49
How are capacity planning values rolled up along the bucket hierarchy?
- A. Item values are rolled up to buckets via the review
- B. Item values are rolled up to buckets via the collection
- C. Project values are rolled up directly to buckets
- D. Item values are rolled up directly to buckets
Answer: D
NEW QUESTION # 50
Where can you define the scheduling type?
NOTE: There are 3 correct answers to this question.
- A. On task level
- B. In customizing
- C. ON phase level
- D. On project definition level
Answer: B,D
NEW QUESTION # 51
What data influence the bottom-up scheduling of a project in portfolio management?
NOTE: There are 3 correct answers to this question.
- A. Relationships between phases
- B. Project type
- C. Duration of tasks
- D. Relationships between tasks
- E. Role demands
Answer: A,C,D
NEW QUESTION # 52
In project management, what data can be copied from a project template during creation of a new project? NOTE: There are 3 correct answers to this question.
- A. Checklist
- B. Dates
- C. Project structure
- D. Responsible organizational unit
- E. Authorizations
Answer: A,B,C
NEW QUESTION # 53
Which information can be assigned to a business partner in project management?
NOTE: There are 3 correct answers to this question
- A. Production resources or tools (PRT)
- B. Personal numbers
- C. Areas and locations
- D. SAP users
- E. Work centers
Answer: B,C,D
NEW QUESTION # 54
When is Bottom-up scheduling mandatory?
- A. When summary tasks are used
- B. When parallel phasing is used
- C. When constraints are used
- D. When actual time are recorded
Answer: D
NEW QUESTION # 55
When you create an item from an initiative, which of the following objects are authorizations inherited from?
NOTE: There are 3 correct answers to this question
- A. Parent bucket
- B. initiative
- C. Project system project
- D. Project management project
- E. Portfolio
Answer: A,B,E
NEW QUESTION # 56
How can an existing project management project be integrated with SAP controlling?
NOTE: There are 2 correct answers to this question.
- A. Assign the project definition to an existing PS project definition manually
- B. Transfer the project structure element internal orders
- C. Assign the project roles to an existing internal order manually
- D. Transfer the project structure element to project system (PS)
Answer: A,C
NEW QUESTION # 57
You have created two portfolio item in separate portfolios.
How can you produce a combined view of the items in financial planning?
- A. Assign both items to the same collection of parent bucket
- B. Create an initiative and assign both items to the initiative
- C. Create a review and assign both items to the review
- D. Assign both item to the same bucket of a classification hierarchy
Answer: B
NEW QUESTION # 58
You want to distribute capacity requirements in a project management project?
How can you distribute the values? NOTE: There are 3 correct answers to this question
- A. Apply a distribution rule
- B. Update the capacity requirements from the roll-up of task requirements
- C. Copy values from resource assignments
- D. Enter the vales manually
- E. Use a distribution function
Answer: A,D,E
NEW QUESTION # 59
What must you configure to view portfolio item data in project management projects?
- A. Set the portfolio management flag to active in customizing for the project type
- B. Set the project management flag to active in customizing for the linking item type
- C. Set the business content data source for portfolio management in customizing
- D. Set the objects link flag to active in customizing for the project management structure
Answer: A
NEW QUESTION # 60
Which of the following multi-currency scenario are supported?
NOTE: There are 2 correct answers to this question
- A. Item currency can be inherited from the assigned bucket
- B. Multiple planning currencies can be used in one bucket
- C. Items In a bucket an only use bucket currencies
- D. Bucket in a portfolio can use different currencies
Answer: A,D
NEW QUESTION # 61
The probability technical success filed is enabled for questionnaires. You have defined a questionnaire for portfolio items In customizing. When you want to fill out the questionnaire for the probability technical success filed an error message is displayed.
What is the reason for the error message?
- A. The field service configuration of the item is missing
- B. The master switch for the interface settings for questionnaires it turned off
- C. The probability technical success field is configured as read only in the field control
- D. The field service configuration of the parent bucket of the item is missing
Answer: D
NEW QUESTION # 62
What can you define in the item template?
- A. Financial planning
- B. Sequence of decision points
- C. Category
- D. Link to a project management project
Answer: B,C
NEW QUESTION # 63
Which method can you use to update multiple values simultaneously in capacity planning for portfolio management?
- A. Distribution function
- B. XML upload
- C. Mass update
- D. Drag and drop
Answer: C
NEW QUESTION # 64
When you confirm a task, you wants the system to calculate the difference between planned work and actual work.
What must you do?
- A. Enter an actual finish date of the task in the future
- B. Set the task status to in process
- C. Ensure that the Rem. Work manually indicator is inactive
- D. Confirm the task using a completion percentage of less than 100
Answer: C
NEW QUESTION # 65
......