NEW QUESTION # 40
What type of time element can be reduced by strategy settings while dispatching?

  • A. Setup time
  • B. Queue time
  • C. Transportation time
  • D. Wait time

Answer: B,D


NEW QUESTION # 41
In the Schedule Production app which setting can you make for the planning strategy?

  • A. Fitness level
  • B. Scheduling control
  • C. Direction
  • D. Fixed pegging
  • E. Planning mode

Answer: B,C,E


NEW QUESTION # 42
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Planning without final assembly (50)
  • B. Make-to-order production (20)
  • C. Planning with final assembly (40)
  • D. Make-to-stock production (10)

Answer: C


NEW QUESTION # 43
What are some uses for the low-level code assigned to each material?

  • A. It is used by engineering to indentify subitems in an engineering bill of material (BOM).
  • B. it is used by ATP to determine the priority of alternative components.
  • C. It is used in MRP to determine the sequence in which materials are planned.
  • D. It is used by product costing to determine how coast are rolled up.

Answer: C,D


NEW QUESTION # 44
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When you create a sales order
  • B. When the MRP result are saved
  • C. When you create a planned order
  • D. When you deliver a sales order

Answer: A


NEW QUESTION # 45
Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)

  • A. Use a planning group.
  • B. Use a resource group.
  • C. Use a propagation range.
  • D. Use heuristic.

Answer: D


NEW QUESTION # 46
Which item statuses can you select inside a material BOM?

  • A. Engineering
  • B. Quality management
  • C. Service
  • D. Sales

Answer: A,D


NEW QUESTION # 47
Which SAP application can be used for forcasting in Supply Chain Planning?

  • A. Integrated Business Planning (IBP)
  • B. Supply Chain Management(SCM)
  • C. Material Requirements Planning (MRP)
  • D. Capacity Requirements Planning (CRP)

Answer: A,B


NEW QUESTION # 48
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
  • B. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • C. The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
  • D. The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.

Answer: A


NEW QUESTION # 49
How can you set up the supply source for the Kanban process in SAP S/4HANA?

  • A. Using quotations for internal and external procurement
  • B. Using run schedule quantities for in-house production
  • C. Using purchasing costs for automated source prioritization
  • D. Using purchase orders for external procurement
  • E. Using stock transfer reservations for stock transfer

Answer: B,D,E


NEW QUESTION # 50
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?

  • A. Schedule in working time only
  • B. Squeeze in
  • C. Find slot
  • D. Insert operation

Answer: C


NEW QUESTION # 51
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with an alternative sequence in the routing
  • B. A production line with a parallel sequence in the routing
  • C. A production line with prioritized alternative work centers
  • D. A production line with more than one work center

Answer: D


NEW QUESTION # 52
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

  • A. Production order release
  • B. Kanban
  • C. Backflushing
  • D. Material requirements planning

Answer: D


NEW QUESTION # 53
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

  • A. Create object selection variant for product-related alerts.
  • B. Create object selection variant for transportation lane-related alerts.
  • C. Assign the overall profile to the authorization profile.
  • D. Assign the alert profile to the overall profile.

Answer: A,D


NEW QUESTION # 54
For a production version to be valid and consistent what requirements must be fulfilled?

  • A. The lot size range must be within the lot-size range of the assigned routing.
  • B. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • C. The assigned routing must be a rate routing.
  • D. The assigned routing must NOT have alternative sequences.
  • E. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.

Answer: A,B,E


NEW QUESTION # 55
Which time elements are part of a routing operation?

  • A. Move time
  • B. Float before production
  • C. Queue time
  • D. Wait time
  • E. Pick/pack time

Answer: C,D,E


NEW QUESTION # 56
The MRP run detected a shortage of a materila that you sorce from an external supplier in full pallets. How can you make sure you will only recive full pallets?

  • A. Use the minimum order quantity
  • B. Use the MRP type for vendor managed inventory.
  • C. Use the reorder point
  • D. Use the fixed lot procedure.

Answer: D


NEW QUESTION # 57
What is the difference between co-products and by-products?

  • A. Only co-products are identified by a special item category in the bill of material (BOM).
  • B. Only co-products can be manufactured in isolation from the main product.
  • C. Only co-products appear in the process or production order settlement rule.
  • D. Only by-products have a zero inventory valuation.

Answer: C


NEW QUESTION # 58
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP controller
  • B. MRP type
  • C. MRP planning file
  • D. MRP group

Answer: A


NEW QUESTION # 59
When can the automatic material availability check occur in a production order?

  • A. At order creation
  • B. At order settlement
  • C. At order release
  • D. At order confirmation

Answer: A,C


NEW QUESTION # 60
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Make-to-order production (20)
  • B. Planning at assembly level (70)
  • C. Planning without final assembly (50)
  • D. Planning with final assembly (40)

Answer: C


NEW QUESTION # 61
......