Pay attention to our Valid and Useful Exam Reviews and take our Exam Torrent as your Study Material. With little time and energy investment, you have a High Efficiency Study experience. Pass your Actual Test with the help of our Actual Reviews.

Download IBM C1000-132 Exam Dumps to Pass Exam Easily in 2024 [Q22-Q39]

Share

Download IBM C1000-132 Exam Dumps to Pass Exam Easily in 2024

Get 100% Real Free IBM Certified Deployment Professional C1000-132 Sample Questions

NEW QUESTION # 22
Calendars can be associated with which three record types?

  • A. Assets
  • B. Job Plan
  • C. Contracts
  • D. Locations
  • E. Person
  • F. Items

Answer: A,D,E


NEW QUESTION # 23
What is the purpose of the Admin mode?

  • A. change System Properties without needing to shut down the Maximo server
  • B. apply changes in Application Designer
  • C. perform administrative functions
  • D. perform Database Configuration without needing to shut down the Maximo server

Answer: D

Explanation:
The purpose of Admin mode in IBM Maximo Manage is to allow users to perform Database Configuration without needing to shut down the Maximo server.


NEW QUESTION # 24
Where in Maximo can the Server IP Addresses and Logged in users be observed?

  • A. Maximo Management Interface Work Center
  • B. Administration Work Center
  • C. Database Configuration application
  • D. Server Management Consol

Answer: A

Explanation:
In Maximo Manage, the Server IP Addresses and Logged in users can be observed in the Maximo Management Interface Work Center.


NEW QUESTION # 25
In the Meters application what are the three meter types?

  • A. GAUGE
  • B. FEATURES
  • C. CALIBRATION
  • D. CONTINUOUS
  • E. CHARACTERISTIC
  • F. CONSTANT

Answer: A,D,E

Explanation:
In the Meters application, the three meter types are GAUGE, CHARACTERISTIC, and CONTINUOUS. GAUGE meters measure a discrete value or range of values, such as the oil pressure in an engine. CHARACTERISTIC meters measure a specific attribute of an asset, such as the temperature of an engine. CONTINUOUS meters track usage or consumption over time, such as the number of hours an asset has been in operation.


NEW QUESTION # 26
On a Work Order with no GL Account specified, which GL Account will take precedence?

  • A. Job Plan
  • B. Asset
  • C. Location
  • D. Work Order Control Account

Answer: D


NEW QUESTION # 27
To what type of objects can a Service Level Agreement be applied?

  • A. any Main Object
  • B. only the Main Object that are Internal
  • C. only the objects based on the Work Order or Ticket Classes
  • D. only the objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items

Answer: D

Explanation:
A Service Level Agreement can be applied only to objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items.


NEW QUESTION # 28
When creating a labor record, what must be associated with it?

  • A. Crew
  • B. User Record
  • C. Person Record
  • D. Supervisor

Answer: C

Explanation:
When you create a labor record in IBM Maximo Manage v8.0, you enable a person to report time against a work request1. Before you create a labor record, you must create a corresponding person record1. A person record is defined at the System level and when a person works across multiple organizations, they need multiple Labor records linked to the same Person record2.


NEW QUESTION # 29
Apart from Standard and Average, what other three costing methods can be used in the Inventory application?

  • A. FILO
  • B. FIFO
  • C. Asset
  • D. LIFO
  • E. LILO
  • F. Weighted Average

Answer: B,D,F

Explanation:
Apart from Standard and Average costing methods in IBM Maximo Manage's Inventory application, three other costing methods that can be used are FIFO (First In First Out), LIFO (Last In First Out) and Weighted Average.


NEW QUESTION # 30
When creating a new Inspection form, a client requires a Work Order to be created if certain responses are recorded. Which two actions are required for this to be achieved?

  • A. In the Question Options, set the Require action flag.
  • B. Make the question response interactive.
  • C. Create an escalation on the QRESPONSE Object.
  • D. Choose Work Order on question action.
  • E. In Form Settings add an Action Script.

Answer: A,D

Explanation:
According to the IBM documentation, you can create inspection forms that detail the questions and types of responses that you want to collect. The inspection forms that you create are then available to inspectors in the Conduct an Inspection tool. You can also add conditions to the response fields of existing questions on inspection forms to gather more information. You can determine which additional response fields appear to inspectors, depending on the answers they gave to inspection form questions.
To create a work order based on certain responses, you need to do two things:
Choose Work Order on question action: This option allows you to specify an action that is triggered when a certain response is selected by the inspector. For example, if a question asks "Is there any damage?", and the inspector selects "Yes", you can choose Work Order as the action that is triggered by this response. This will create a work order for repairing the damage.
In the Question Options, set the Require action flag: This option allows you to indicate that an action is required for a question. For example, if a question asks "Is there any damage?", and you set the Require action flag to Yes, then the inspector must select a response that triggers an action, such as Work Order or Notification. If they select a response that does not trigger an action, such as "No" or "N/A", they will see an error message and will not be able to submit the inspection form.


NEW QUESTION # 31
What are three available associations in the Hazards application?

  • A. Tag Outs
  • B. Precautions
  • C. Safety Plans
  • D. Material Safety Data Sheets (MSDS)
  • E. Lock Outs
  • F. Hazardous Materials

Answer: B,D,F

Explanation:
The Hazards application in IBM Maximo Manage v8.0 allows users to associate Material Safety Data Sheets (MSDS), Hazardous Materials, and Precautions with a particular hazard. These associations help in managing safety information related to hazards and in ensuring compliance with safety regulations.


NEW QUESTION # 32
What information can be updated in the Master PM application for an associated Preventive Maintenance record (PM)?

  • A. Generate Work Orders
  • B. Work Order Status
  • C. PM Hierarchy
  • D. PM Forecast

Answer: D

Explanation:
The PM Forecast field on the Master PM record is used to specify how many days ahead you want to forecast work orders for associated PMs2. This field can be updated in the Master PM application and affects how many work orders are generated from the associated PMs.


NEW QUESTION # 33
When viewing a Storeroom in the Manage Inventory Work Center, what are three record sets (tabs) that can be viewed?

  • A. Vendors
  • B. Counts
  • C. Reconcile
  • D. Year to Date Figures
  • E. Child Storerooms
  • F. Balances

Answer: B,E,F

Explanation:
In IBM Maximo Manage v8.0 implementation, when viewing a Storeroom in the Manage Inventory Work Center, the three record sets (tabs) that can be viewed are Child Storerooms, Counts, and Balances. These record sets provide different views of the inventory and allow users to manage and track inventory levels and movements.


NEW QUESTION # 34
How many failure reports can be created for the same Work Order?

  • A. one failure report for the work order and only one for each task of the work order
  • B. unlimited failure reports for either a work order or any of its tasks
  • C. just one failure report
  • D. unlimited failure reports for each work order, but none for a task

Answer: A

Explanation:
In IBM Maximo Manage, you can create one failure report for a Work Order and only one for each task of the Work Order.


NEW QUESTION # 35
What can be done when decommissioning a location that cannot be done when decommissioning an asset?

  • A. Delete Associated Service Addresses That will be made Redundant?
  • B. Remove All References to This Location from All Job Plans?
  • C. Remove All Reference to This Location from All Contracts?
  • D. Roll New Status down to All Assets in All Changed Locations?

Answer: D

Explanation:
When decommissioning a location in IBM Maximo Manage, you can roll the new status down to all assets in all changed locations. This cannot be done when decommissioning an asset.


NEW QUESTION # 36
Which two statuses of a Purchase Order will allow a receipt of new items to be processed in the Receiving application if the Purchase Order is not being revised?

  • A. REVISD
  • B. PNDREV
  • C. APPR
  • D. HOLD
  • E. INPRG

Answer: C,E

Explanation:
In IBM Maximo Manage, if a Purchase Order is not being revised, two statuses that will allow a receipt of new items to be processed in the Receiving application are APPR and INPRG.


NEW QUESTION # 37
In which three applications can Asset Depreciation be configured?

  • A. Asset Templates
  • B. Assets
  • C. Tools
  • D. Chart of Accounts
  • E. Locations
  • F. Item Master

Answer: A,B,E

Explanation:
Asset Depreciation can be configured in three applications in IBM Maximo Manage v8.0 according to IBM's documentation. These applications are:
Asset Templates
Assets
Locations


NEW QUESTION # 38
How is the Lock Out / Tag Outs application structured?

  • A. Define the isolation procedures on a set of related assets and specify a sequence.
  • B. Specify a Lock Out on the Location or Asset and define the Tag Out Operations.
  • C. Specify a Tag Out on the Location or Asset and define the Lock Out Operations.
  • D. Specify a Lock Out on an Asset with a Locking Device and define the Tag Out Operations.

Answer: B

Explanation:
In IBM Maximo Manage v8.0 implementation, the Lock Out / Tag Out application is structured such that you specify a Lock Out on the Location or Asset and define the Tag Out operations. This application is used to manage the procedures and controls put in place to protect personnel from injury due to unintended or inadvertent equipment or system operation.


NEW QUESTION # 39
......


IBM C1000-132 exam is a comprehensive exam that covers a wide range of topics related to IBM Maximo v8.0 implementation. C1000-132 exam contains 64 multiple-choice questions that are designed to test the candidate's knowledge and skillset. Candidates will have 90 minutes to complete the exam and must score at least 70% to pass. C1000-132 exam is available in English and Japanese languages.


IBM C1000-132 certification exam is designed to test the knowledge and skills of professionals who are responsible for implementing and managing IBM Maximo Manage v8.0. C1000-132 exam is intended for individuals who have experience with IBM Maximo and are looking to validate their knowledge and skills in this area. IBM Maximo Manage v8.0 Implementation certification exam is an industry-recognized credential that can help individuals advance their careers in the field of enterprise asset management.

 

C1000-132 Study Guide Realistic Verified Dumps: https://www.examsreviews.com/C1000-132-pass4sure-exam-review.html

Accurate C1000-132 Questions with Free and Fast Updates: https://drive.google.com/open?id=1iZDlihGarsSdXivXpD2_J0JdFqqz9Ifm