[Mar-2024] Latest C-S43-2022 Exam Dumps for Pass Guaranteed [Q13-Q38]

Share

[Mar-2024] Latest C-S43-2022 Exam Dumps for Pass Guaranteed

Reliable SAP Certified Application Associate C-S43-2022 Dumps PDF Mar 16, 2024 Recently Updated Questions

NEW QUESTION # 13
Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.

  • A. Dispatch maintenance order operations
  • B. Print job papers from a maintenance order.
  • C. Schedule and dispatch maintenance operations by shifts.
  • D. Monitor maintenance order operations due in the next 4 weeks

Answer: A,D

Explanation:
Explanation
The Resource Scheduling for Maintenance Planners app allows you to monitor important KPIs for your work centers, such as utilization, priority of due maintenance orders, and unconfirmed maintenance orders. You can also use filters to show the information that you are interested in. By clicking a card, you can access the Manage Work Center Utilization app, where you can dispatch maintenance order operations to your work centers. You cannot schedule and dispatch maintenanceoperations by shifts or print job papers from a maintenance order in this app. These functions are available in other apps, such as the Maintenance Scheduling Board app and the Print Job Papers app. References: Resource Scheduling for Maintenance Planners | SAP Help Portal and Resource Scheduling for Maintenance Planners | SAP Blogs


NEW QUESTION # 14
In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question.

  • A. Work center
  • B. Maintenance order header
  • C. Notification activity
  • D. Maintenance order operation

Answer: A,D


NEW QUESTION # 15
What do you have to consider when setting up the refurbishment process?

  • A. Mark the order type for refurbishment in customizing.
  • B. Assign a stock determination rule to the PM order type
  • C. Assign a view profile for refurbishment to the order type.
  • D. Assign valuation type C to the order type.

Answer: B,C

Explanation:
Explanation
To set up the refurbishment process, you have to consider the following steps:
Assign a view profile for refurbishment to the order type: A view profile determines which fields and tabs are displayed in the order header and item. You can assign a view profile for refurbishment to the order type in Customizing for Plant Maintenance and Customer Service under Maintenance and Service Processing -> Maintenance and Service Orders -> Functions and Settings for Order Types -> Assign View Profiles to Order Types. The view profile for refurbishment enables you to enter the material and serial number of the defective item, as well as the valuation type and the target material for the refurbished item12.
Assign a stock determination rule to the PM order type: A stock determination rule defines the sequence in which the system searches for available stock when you create a reservation or a goods movement for a material. You can assign a stock determination rule to the PM order type in Customizing for Plant Maintenance and Customer Service under Maintenance and Service Processing -> Maintenance and Service Orders -> Functions and Settings for Order Types -> Assign Stock Determination Rule to Order Type. The stock determination rule for refurbishment allows you to specify the valuation type of the defective item that is to be refurbished12.
The other options are not correct for the following reasons:
Assign valuation type C to the order type: Valuation type C is not a valid option for the order type.
Valuation type C is a valuation category that indicates that the material is valuated by condition, such as new, refurbished, or defect. Valuation type C is assigned to the material master, not to the order type3.
Mark the order type for refurbishment in customizing: There is no option to mark the order type for refurbishment in customizing. The order type for refurbishment is determined by the order category, which is 30 for refurbishment orders. The order category is assigned to the order type in Customizing for Plant Maintenance and Customer Service under Maintenance and Service Processing -> Maintenance and Service Orders -> Order Types -> Define Order Types3.
References: 3: Explaining Refurbishment of Spare Parts | SAP Learning 1: SAP Refurbishment Process Tutorial - Free SAP PM Training - ERProof 2: Refurbishment Process - in simple terms | SAP Blogs


NEW QUESTION # 16
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?

  • A. Open reservations are recompiled.
  • B. Open purchase requisitions are recompiled
  • C. Open purchase orders are recompiled.
  • D. Referenced notifications are put in Process again.

Answer: A,B


NEW QUESTION # 17
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?

  • A. Scheduling type
  • B. Call horizon
  • C. Package offset
  • D. Initial/subsequent buffer

Answer: B

Explanation:
Explanation
The call horizon is the parameter in a maintenance strategy that determines the start/end date of the maintenance order. The call horizon defines the percentage of the maintenance cycle that must be expired before the system generates a call object, such as a maintenance order or notification. The start date of the call object is calculated by adding the callhorizon to the last completion date of the maintenance plan. The end date of the call object is calculated by adding the maintenance cycle to the last completion date of the maintenance plan. The call horizon can be used to control the scheduling of preventive maintenance activities and ensure that they are performed within the planned time frame. References:
Preventive Maintenance in SAP S/4HANA, Lesson 2: Using Cycle Set Sequences, page 13-14 Highlights for Asset Management in SAP S/4HANA 2021, New Scope Items, Fig. 2: Standardized end-to-end process Proactive Maintenance (4HH)


NEW QUESTION # 18
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note:
There are 2 correct answers to this question

  • A. If you use the Resource Scheduling apps, you always dispatch orders and operations.
  • B. The order moves to the Preparation phase once it is approved and released
  • C. The configuration of the order type decides whether you use Resource Scheduling or not.
  • D. Maintenance Planning Buckets give you a list of non-approved notifications

Answer: B,C

Explanation:
Explanation
The Preparation and Scheduling phase within phase-based maintenance is the phase where the maintenance planner divides the maintenance effort into manageable groups, levels out the workload over several weeks, determines the concrete time period for the requested maintenance work, and checks the availability of all the resources, spare parts and services needed1.
Option B (The order moves to the Preparation phase once it is approved and released) is correct, because the approval and release of the order is the last step of the previous phase (Approval phase)2. Once the order is approved and released, it is ready for preparation and scheduling.
Option D (The configuration of the order type decides whether you use Resource Scheduling or not) is also correct, because the order type determines whether the order is relevant for resource scheduling or not2. Resource scheduling is an optional step in the Preparation and Scheduling phase, where the planner can assign and dispatch the orders and operations to the technicians using the Resource Scheduling apps2.
Option A (If you use the Resource Scheduling apps, you always dispatch orders and operations) is incorrect, because the Resource Scheduling apps allow the planner to either dispatch or assign the orders and operations2. Dispatching means that the planner assigns a specific technician and a specific time slot for the order or operation, while assigning means that the planner assigns only a technician or a team, but not a specific time slot2.
Option C (Maintenance Planning Buckets give you a list of non-approved notifications) is also incorrect, because the Maintenance Planning Buckets app gives the planner a list of approved and released orders that are ready for preparation and scheduling2. The non-approved notifications are handled in the previous phase (Screening phase)2.
References:
Phase Model for the Maintenance Process
New Phase Model for the Maintenance Processes in S/4HANA Cloud
Explaining the Phase-based Process
Maintenance Process Phases


NEW QUESTION # 19
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question

  • A. Change a reference location.
  • B. Assign documents
  • C. Assign a subordinate piece of equipment.
  • D. Edit classification data and characteristics.
  • E. Create a task list for functional location

Answer: B,C,D

Explanation:
Explanation
The SAP Fiori app "Create Technical Object" allows you to create a new functional location and perform the following actions:
Edit classification data and characteristics. You can assign a class to the functional location and enter values for the characteristics of the class. This helps you to categorize and search for functional locations based on their attributes1 Assign documents. You can attach documents to the functional location, such as drawings, manuals, or certificates. This helps you to provide additional information and documentation for the functional location1 Assign a subordinate piece of equipment. You can assign an existing piece of equipment as a subordinate object to the functional location. This helps you to establish a hierarchical structure of technical objects and show the relationship between them1 The SAP Fiori app "Create Technical Object" does not allow you to perform the following actions:
Create a task list for functional location. You cannot create a task list for the functional location using this app. You need to use a different app, such as "Manage Task Lists", to create and maintain task lists for technical objects2 Change a reference location. You cannot change the reference location of the functional location using this app. You need to use a different app, such as "Change Functional Location", to modify the reference location of an existing functional location3 References: 1: Create Technical Object | SAP Help Portal 2: [Manage Task Lists | SAP Help Portal] 3:
[Change Functional Location | SAP Help Portal]


NEW QUESTION # 20
What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question

  • A. Maintain a serial number for an existing equipment master.
  • B. Assign a serial number profile to an additional business view for equipment category
  • C. Add a serialized material to the equipment serial data view.
  • D. Assign a serial number profile to the related material master.
  • E. Assign a serial number profile to the equipment category

Answer: C,D,E


NEW QUESTION # 21
What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to thisquestion?

  • A. It can be assigned directly to the user via personalization
  • B. It is based on an SAP Fiori tile catalog.
  • C. It is assigned via a portal role.
  • D. It provides only HTML5-based apps

Answer: A,B

Explanation:
Explanation
A SAP Fiori tile group is a subset of apps from one or more catalogs that are displayed on the user's entry page of the SAP Fiori launchpad1. A tile group has the following characteristics:
It is based on an SAP Fiori tile catalog. A catalog is a logical group of apps or tiles that defines the set of all tiles that users can use to personalize the home page2. A group can contain apps from different catalogs, depending on the user's role and authorization1.
It can be assigned directly to the user via personalization. The user can personalize the entry page by adding or removing apps to pre-delivered groups or self-defined groups2. The user can also reorder the groups and tiles according to their preference1.
It does not provide only HTML5-based apps. A tile group can contain apps that are based on different technologies, such as SAPUI5, Web Dynpro ABAP, or SAP GUI transactions1.
It is not assigned via a portal role. A tile group is assigned to the user's role via the SAP Role Maintenance transaction PFCG2. A portal role is a different concept that is used in the SAP Enterprise Portal to define the access rights and content for portal users.
References: Configure the Fiori Launchpad Tiles using Catalogs & Groups, Setup of Catalogs, Groups, and Roles in the SAP Fiori Launchpad, [Portal Roles]


NEW QUESTION # 22
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.

  • A. The planner can change planned costs at the operation level
  • B. The assignment of the notification to the maintenance order header cannot be deleted.
  • C. The planner can change estimated costs only at the header level
  • D. The controller can determine actual cost surcharges.
  • E. Goods receipts for external services can be entered.

Answer: A,D,E


NEW QUESTION # 23
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question

  • A. The order moves to the Preparation phase once it is approved and released
  • B. If you use the Resource Scheduling apps, you always dispatch orders and operations.
  • C. Maintenance Planning Buckets give you a list of non-approved notifications
  • D. The configuration of the order type decides whether you use Resource Scheduling or not.

Answer: A,B


NEW QUESTION # 24
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question

  • A. Counter overflow reading
  • B. Start counter reading
  • C. Scheduling period
  • D. Estimated annual performance

Answer: B,D

Explanation:
Explanation
To schedule a performance-based maintenance plan, you need to specify the start counter reading and the estimated annual performance of the equipment or functional location. The start counter reading is the initial value of the counter assigned to the maintenance plan. The estimated annual performance is the expected value of the counter for one year. These parameters are used to calculate the maintenance cycle and the due date for the maintenance plan. The scheduling period and the counter overflow reading are optional


NEW QUESTION # 25
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question

  • A. Complete
    * Close Report
  • B. Release
    * Print
  • C. Release
    * Start Work
  • D. Schedule
    * Dispatch

Answer: A,C


NEW QUESTION # 26
A Task List contains two operations:
*Every 3 MON: pump inspection
*Every 24 MON. pump replacement
When replacing the pump, the operation pump inspection will be ignored. How can you achieve this?

  • A. Assign different hierarchy levels
  • B. Create a cycle set sequence
  • C. Set the lead float
  • D. Create a task list hierarchy

Answer: B

Explanation:
Explanation
A cycle set sequence is a feature that allows you to combine several multiple counter plan cycles in a set and determine the order in which the system considers the cycle sets for scheduling. A multiple counter plan is a maintenance plan that is based on one or more performance-based or time-based cycles1.
In this case, you can create a cycle set sequence with two cycles:
Cycle 1: Every 3 MON: pump inspection
Cycle 2: Every 24 MON: pump replacement
You can assign a different maintenance item and task list to each cycle, and specify the repetition factor for each cycle. The repetition factor determines how many times the cycle is repeated before the next cycle in the sequence is considered. For example, if you set the repetition factor of cycle 1 to 8, the system will schedule the pump inspection 8 times before scheduling the pump replacement.
By creating a cycle set sequence, you can achieve the requirement that when replacing the pump, the operation pump inspection will be ignored. The system will only generate a call object for the maintenance item that is assigned to the current cycle set. Therefore, when the pump replacement is due, the system will not generate a call object for the pump inspection.
The other options are incorrect because:
Assign different hierarchy levels: Hierarchy levels are used to structure the task list operations into groups and subgroups. They do not affect the scheduling of the task list operations.
Set the lead float: Lead float is a time buffer that is added to the start or finish date of a task list operation. It does not affect the scheduling of the task list operations.
Create a task list hierarchy: A task list hierarchy is a structure that contains several task lists that are linked together by a superior task list. It does not affect the scheduling of the task list operations.
References: 1: Cycle Set Sequence in Multiple Counter Plan - SAP Help Portal


NEW QUESTION # 27
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question

  • A. In the list editing (single-level) for maintenance orders
  • B. Within a maintenance order
  • C. In the report Material: Where-Used List
  • D. In the material reservation list in inventory management

Answer: A,B

Explanation:
Explanation
You can see the results of the material availability check for maintenance orders in two places: within a maintenance order and in the list editing (single-level) for maintenance orders.
Within a maintenance order, you can see the material availability status for each component in the Components tab. The status can be one of the following: Available, Not Available, Partially Available, or Not Checked. You can also see the availability date, which is the date on which the component can be fully available. You can access the maintenance order from the Manage Maintenance Orders app or the Change Maintenance Order app1.
In the list editing (single-level) for maintenance orders, you can see the material availability status for each order in the Material Availability column. The status can be one of the following: Available, Not Available, Partially Available, or Not Checked. You can also see the availability date, which is the date on which all the components for the order can be fullyavailable. You can access the list editing from the List Editing (Single-Level) for Maintenance Orders app2.
References: 1: Checking the Material Availability Status 2: [List Editing (Single-Level) for Maintenance Orders]


NEW QUESTION # 28
Which capabilities does SAP Service and Asset Manager (formerly SAP Asset Manager) provide? Note: There are 3 correct answers to this question

  • A. SAP Service and Asset Manager provides single sign-on functionality.
  • B. SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP
  • C. SAP Service and Asset Manager can run on smart watches.
  • D. SAP Service and Asset Manager is available only for the iOS platform.
  • E. SAP Service and Asset Manager can be used offline.

Answer: A,B,E


NEW QUESTION # 29
Which SAP UI technology is used for the Report and Repair Malfunction app?

  • A. Business Server Pages
  • B. Web Dynpro
  • C. SAPUI5
  • D. SAP GUI for HTML

Answer: C

Explanation:
Explanation
The Report and Repair Malfunction app is a Fiori app that uses SAPUI5 as the UI technology. SAPUI5 is a modern, HTML5-based, JavaScript UI library that enables developers to create rich and responsive web applications. Web Dynpro, SAP GUI for HTML, and Business Server Pages are older UI technologies that are not used for Fiori apps. References:
Report and Repair Malfunction | SAP Help Portal
First Fiori App for Maintenance Technician: "Report and Repair Malfunction" for SAP S/4HANA Cloud 1708 and 1709 | SAP Blogs


NEW QUESTION # 30
Which options do you have in SAP S/4HANA Asset Management, Public Cloud Edition? Note: There are 2 correct answers to this question

  • A. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
  • B. You do NOT have access to the SAP S/4HANA back-end system.
  • C. You have access to the SAP S/4HANA back-end system
  • D. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network

Answer: A,B


NEW QUESTION # 31
What do you have to consider when planning maintenance work that is to be carried out by an external company?

  • A. In the control key assigned to the order operation, the "Service" indicator must always be activated.
  • B. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.
  • C. For the maintenance order type, you have to assign the Enhanced Procurement Mode.
  • D. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.

Answer: C,D

Explanation:
Explanation
When planning maintenance work that is to be carried out by an external company, you have to consider the following aspects:
If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet. This is because the service entry sheet is used to record the services performed by the external company and to verify the invoice. The service entry sheet is linked to the purchase order and the maintenance order operation.
For the maintenance order type, you have to assign the Enhanced Procurement Mode. This is because the Enhanced Procurement Mode enables you to use lean services and enhanced limits for external services. Lean services are intended for the procurement of small or highly specialized services that are carried out by external suppliers as part of an internal or external operation. They can be maintained in the material master as service products. Enhanced limits allow you to define a maximum amount for the external service without specifying the service specifications in advance.
If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system. This is not true, because the goods receipt is only required for external materials, not for external services. For external services, the service entry sheet is used instead.
In the control key assigned to the order operation, the "Service" indicator must always be activated. This is not true, because the "Service" indicator is only required for external services, not for external operations. For external operations, the "External Processing" indicator must be activated instead. References: External Services Management (MM-SRV) | SAP Help Portal, Highlights for Asset Management in SAP S/4HANA 2021 | SAP Blogs.


NEW QUESTION # 32
Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question?

  • A. Technical objects
  • B. Work orders and operations
  • C. Cost analytics
  • D. Breakdown analytics
  • E. ESRI Maps

Answer: A,B,E


NEW QUESTION # 33
Which operations can the responsible person perform after a maintenance order is technically completed?
Note: There are 2 correct answers to this question

  • A. Change the settlement rule
  • B. Change the planned costs
  • C. Update the estimated costs
  • D. Lock or unlock the order

Answer: A,D

Explanation:
Explanation
After a maintenance order is technically completed, the responsible person can perform the following operations1:
Lock or unlock the order: This prevents or allows further changes to the order data, such as actual costs, settlement rule, or confirmation data.
Change the settlement rule: This allows the responsible person to adjust the distribution of costs to the relevant receivers, such as cost centers, assets, or orders.
Post goods movements: This allows the responsible person to record the consumption or return of materials that were used for the maintenance work.
Enter measurement documents: This allows the responsible person to record the measurement readings of the technical objects that were maintained.
The responsible person cannot perform the following operations after a maintenance order is technically completed1:
Update the estimated costs: This is only possible before the order is released or during the execution phase.
Change the planned costs: This is only possible before the order is released or during the execution phase.
Change the order type: This is only possible before the order is released.
Change the order status: This is only possible before the order is technically completed or after it is reversed.
Therefore, the correct answers are A and C. References: 1: Maintenance Order Types | SAP Help Portal


NEW QUESTION # 34
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct answers to this question.

  • A. Capacity category
  • B. Planner group
  • C. Calculation key
  • D. Organizational unit (HR)

Answer: A,D


NEW QUESTION # 35
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question

  • A. Change the estimated costs.
  • B. Change the pronty
  • C. Cancel status Released.
  • D. Book a goods receipt.

Answer: A,D

Explanation:
Explanation
When you cancel the technical completion of a maintenance order, you can perform the following operations:
Book a goods receipt for the materials that were ordered for the maintenance order. This operation is possible because canceling the technical completion reverses the goods issue that was posted when the order was technically completed. The materials are returned to the warehouse and can be received again when the goods receipt is posted1 Change the estimated costs of the maintenance order. This operation is possible because canceling the technical completion allows you to edit the cost elements and values in the order header and operations. You can also change the settlement rule and the budget of the order2 You cannot perform the following operations when you cancel the technical completion of a maintenance order:
Cancel the status Released of the maintenance order. This operation is not possible because the status Released is set when the order is created and cannot be reversed. The status Released indicates that the order is ready for execution and can be planned, scheduled, and confirmed2 Change the priority of the maintenance order. This operation is not possible because the priority is determined by the notification that triggered the order and cannot be changed in the order itself. The priority indicates the urgency and importance of the maintenance task3 References: 1: SAP Help Portal - Year-End Closing 3: Exploring Resource Scheduling - SAP Learning 2:
Cancel Technical Completion | SAP Community


NEW QUESTION # 36
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question

  • A. Change a reference location.
  • B. Assign a subordinate piece of equipment.
  • C. Assign documents
  • D. Edit classification data and characteristics.
  • E. Create a task list for functional location

Answer: A,C,D


NEW QUESTION # 37
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

  • A. Completion data
  • B. Change documents
  • C. Call object
  • D. Maintenance activity type
  • E. Order type

Answer: A,B,C


NEW QUESTION # 38
......


SAP C-S43-2022 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Describe and implement the process of corrective maintenance using traditional
  • Describe and implement technical asset structures following fundamental concepts
Topic 2
  • Organizational Units and Master Data
  • Describe and implement the process of breakdown maintenance using traditional
Topic 3
  • Describe the options for preventive maintenance using task lists
  • User Interface and Mobile Maintenance
Topic 4
  • Describe and implement the necessary organizational units
  • Time-based strategy and performance-based strategy maintenance plans
Topic 5
  • Describe UI technologies and client types used with SAP S
  • 4HANA Asset Management
  • Maintenance Processing - Advanced Functions

 