[Nov-2021] C_TS422_1909 Dumps are Available for Instant Access using ExamsReviews
C_TS422_1909 Dumps 2021 - New SAP C_TS422_1909 Exam Questions
SAP C_TS422_1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
NEW QUESTION 39
What is the first step in the MRP run?
Please choose the correct answer.
Response:
- A. BOM explosion
- B. Lot size calculation
- C. Source determination
- D. Net requirements calculation
Answer: D
NEW QUESTION 40
Which of the following data objects are updated when a user confirms an operation?
Please choose the correct answer.
Response:
- A. Production order header status
- B. Production order total order quantity
- C. Shop floor information system
- D. Warehouse transfer order status
Answer: C
NEW QUESTION 41
Which advanced functionality has been embedded in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Available-to-promise
- B. Capacity planning
- C. Supply Network Planning
- D. Backorder processing
- E. Demand planning
Answer: A,B,D
NEW QUESTION 42
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red Base
- B. Top of Yellow
- C. Top of Green
- D. Top of Red
Answer: C
NEW QUESTION 43
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A. Bulk materials
- B. By-products
- C. Waste products
- D. Continuous flow materials
- E. Co-products
Answer: B,C,E
NEW QUESTION 44
During production order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Lot size or material cost
- B. Planned order or material number
- C. Validity period or sales order
- D. Alphanumeric or quota arrangement
Answer: D
NEW QUESTION 45
What steps are possible in a PP/DS production planning run?
There are 3 correct answers to this question.
Response:
- A. Detailed scheduling functions
- B. Optimization
- C. Demand consumption
- D. Backorder processing
- E. Heuristics
Answer: A,B,E
NEW QUESTION 46
What does the industry sector determine? Note: There are 2 correct answers to this question.
- A. Which transaction you can use to create a new material
- B. Whether a material master field is required, changeable, displayed, or hidden
- C. Whether material numbers are assigned internally or externally
- D. Which material master views can be maintained
Answer: B,D
NEW QUESTION 47
In order to use strategy 70 - Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Response:
- A. Individual/Collective Indicator
- B. Mixed MRP indicator
- C. Dependent Requirements indicator
- D. Storage Location MRP Indicator
Answer: B
NEW QUESTION 48
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order's components are copied from the picking list.
- B. The planned order is converted to a production order.
- C. The planned order generates capacity requirements.
- D. The planned order's component availability is checked
Answer: C
NEW QUESTION 49
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan?
There are 3 correct answers to this question.
Response:
- A. Use optimization with respect to set-up times
- B. Use rescheduling with an alternative mode
- C. Use a bucket-oriented capacity check
- D. Use DS heuristic "Schedule Sequence"
- E. Use multilevel MRP run for the products on the resource
Answer: A,B,D
NEW QUESTION 50
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. What determines whether the storage location can be derived from the production version?
- A. MRP Profile
- B. MRP Group
- C. MRP Controller
- D. Plant Data
Answer: B
NEW QUESTION 51
In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.
Response:
- A. Process order
Control recipe
Process message
PI sheet - B. Process order
Control recipe
PI sheet
Process message - C. Control recipe
Process order
PI sheet - D. Process message
Control recipe
Process order
Process message
PI sheet
Answer: B
NEW QUESTION 52
When do you recommend the use of repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. High product stability
- B. Low product complexity
- C. Low product stability
- D. High product complexity
Answer: A,B
NEW QUESTION 53
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Consumption-based planning
- B. Manual planning without check
- C. Material requirements planning
- D. Forecast planning
Answer: A
NEW QUESTION 54
Which of the following are included as SAP S/4HANA Sales Simplifications?
There are 3 correct answers to this question.
Response:
- A. SAP order Fulfillment replaces ERP SD Availability Checking
- B. SAP Sales Support replaces SAP CRM
- C. SAP Revenue Accounting replaces ERP SD Revenue Recognition
- D. SAP GTS replaces ERP SD Foreign Trade
- E. Settlement Management replaces ERP SD Rebates
Answer: C,D,E
NEW QUESTION 55
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
Response:
- A. Work center hierarchy
- B. BOM status
- C. Lot sizes
- D. Task list group number
- E. Validity dates
Answer: B,C,E
NEW QUESTION 56
The setup time on the production line to produce a material is extensive. You would like to avoid multiple setups and limit the production of the material based on a planning calendar.
Which type of lot size procedure should you use to accomplish this?
Please choose the correct answer.
Response:
- A. Periodic lot sizing
- B. Exact lot sizing
- C. Minimum lot sizing
- D. Fixed lot sizing
Answer: A
NEW QUESTION 57
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.
- A. At order confirmation
- B. At order settlement
- C. At order release
- D. At order creation
Answer: C,D
NEW QUESTION 58
What is the purpose of collective orders?
- A. To combine order management of co-products and by-products with the main product
- B. To manage production orders for an entire finished product on multiple levels
- C. To post production costs on a cost collector instead of the production order
- D. To post any component withdrawals single back flush with order confirmation
Answer: B
NEW QUESTION 59
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
- A. MRP planning file
- B. MRP controller
- C. MRP group
- D. MRP type
Answer: B
NEW QUESTION 60
......
C_TS422_1909 Exam Certification Details:
| Duration: | 180 mins |
| Level: | Associate |
| Cut Score: | 55% |
| Languages: | German, English, French, Chinese |
| Exam: | 80 questions |
| Sample Questions: | SAP C_TS422_1909 Exam Sample Question |
SAP C_TS422_1909 Exam Practice Test Questions: https://www.examsreviews.com/C_TS422_1909-pass4sure-exam-review.html