Pay attention to our Valid and Useful Exam Reviews and take our Exam Torrent as your Study Material. With little time and energy investment, you have a High Efficiency Study experience. Pass your Actual Test with the help of our Actual Reviews.

Pass SAP Certified Application Associate C_TS422_2020 exam [Nov 20, 2021] Updated 82 Questions [Q38-Q53]

Share

Pass SAP Certified Application Associate C_TS422_2020 exam [Nov 20, 2021] Updated 82 Questions

SAP C_TS422_2020 Actual Questions and 100% Cover Real Exam Questions


C_TS422_2020 Exam Certification Details:

Cut Score:56%
Exam:80 questions
Sample Questions: SAP C_TS422_2020 Exam Sample Question
Level:Associate
Duration:180 mins

 

NEW QUESTION 38
When do you use variant bills of materials (BOMB)?

  • A. When multiplematerial is have similar BOMB
  • B. When a material has multiple BOMB
  • C. When multiple material also have the same BOM
  • D. When a material has a configurable BOM

Answer: C

 

NEW QUESTION 39
Which time elements can be reduced by a reductionstrategy? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Goods receipt processing time
  • C. Queue time
  • D. Float after production
  • E. Move time

Answer: C,D,E

 

NEW QUESTION 40
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?

  • A. Use a planning group.
  • B. Use a resource group.
  • C. Use a heuristic.
  • D. Use a propagation range.

Answer: C

 

NEW QUESTION 41
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?

  • A. Kanban
  • B. Material requirements planning
  • C. Production order release
  • D. Back flushing

Answer: B

 

NEW QUESTION 42
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the MRP controller
  • B. In the routing
  • C. In the production version
  • D. In the production order type
  • E. In the bill of materials (BOM)

Answer: A,B,D

 

NEW QUESTION 43
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Planning without final assembly (50)
  • B. Planning with final assembly (40)
  • C. Make-to-order production (20)
  • D. Make-to-stock production (10)

Answer: B

 

NEW QUESTION 44
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with an alternative sequence in the routing
  • B. A production line with prioritized alternative work centers
  • C. A production line with more than one work center
  • D. A production line with a parallel sequence in the routing

Answer: C

 

NEW QUESTION 45
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

  • A. It is used by ATP to determine the priority of alternative components.
  • B. It is used in MRP to determine the sequence in which materials are planned.
  • C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
  • D. It is used by product costing to determine how costs are rolled up.

Answer: B,D

 

NEW QUESTION 46
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.

  • A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
  • B. In Customizing you can decide by material type whether to use the long material number.
  • C. The display template for material numbers applies to all clients.
  • D. The number of leading zeros for internal numbers is client-specific.

Answer: A,C

 

NEW QUESTION 47
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.

  • A. Use a specific MRP type.
  • B. Use a specific material status.
  • C. Use a specific MRP controller.
  • D. Use a specific material group

Answer: A,C

 

NEW QUESTION 48
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

  • A. Minimum wait time
  • B. Production time
  • C. Goods receipt processing time
  • D. Queue time

Answer: D

 

NEW QUESTION 49
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Orders (dispatched) chart
  • C. Order (pool) chart
  • D. Capacity requirements chart

Answer: A,D

 

NEW QUESTION 50
When can the material availability check occur automatically in a production order? Note: There are 2 correct answers to this question.

  • A. At order release
  • B. At order settlement
  • C. At order confirmation
  • D. At order creation

Answer: A,D

 

NEW QUESTION 51
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a negative planning horizon in the strategy profile.
  • B. Specify a positive offset time in the strategy profile.
  • C. Specify a negative offset time in the strategy profile.
  • D. Specify a positive planning horizon in the strategy profile.

Answer: C

 

NEW QUESTION 52
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.

  • A. Planned delivery time
  • B. Operation duration
  • C. Total replenishment lead time
  • D. In-house production time

Answer: A,D

 

NEW QUESTION 53
......


SAP C_TS422_2020 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Identify and explain production relevant master data
  • Outline best practices for using SAP S/4HANA
Topic 2
  • Outline production planning components and functions, differentiate consumption-based planning vs. MRP
  • Identify repetitive manufacturing specific master data
Topic 3
  • Outline both motivation and background of SAP S/4HANA
  • Detailed scheduling planning board) and advanced planning
Topic 4
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Explain line load planning and confirmation, outline Kanban master data and Kanban processes

 

SAP C_TS422_2020 Real 2021 Braindumps Mock Exam Dumps: https://www.examsreviews.com/C_TS422_2020-pass4sure-exam-review.html